One problem followed to its cause, for owners who need more than a defect list.
One of our inspectors will call you back. If it is urgent, call 1300 471 805.
An investigation is measured against the National Construction Code and ABCB Housing Provisions, the NSW Guide to Standards and Tolerances 2017, AS/NZS 3500.3 for stormwater, AS 3740 and AS 4654.2 for waterproofing, AS 2870 for footings and your plans and contract.
8 checkpoints across 8 areas on a standard Tallawong defect investigation report. Please have power on and every room unlocked. On a build, let the supervisor know an independent inspector will attend; anything we cannot reach safely is named in the report.










New Construction Stage Inspections Seven checks through a Tallawong build, slab to keys.
Pre-Handover (PCI) Inspections The finished house, walked room by room before you sign.
Pre-Purchase Building Inspections An AS 4349.1 report on a young house before you exchange.
Building and Pest Inspections Building condition and timber pests from a single visit. Instant online pricing, or talk to the booking team on 1300 471 805.
No. It is written for you and your builder to fix the problem. If the dispute goes to the tribunal you need an NCAT expert witness report prepared under Procedural Direction 3, which we can write from the same findings.
A handover inspection lists everything visible across the house. An investigation narrows to one question, such as where the balcony water is coming from, and spends the time proving the cause.
No destructive opening up, no laboratory or geotechnical testing, no engineering certification and no repair work. If a cause cannot be confirmed without those, the report says so and names who should take it further.