Slab pre-pour inspection in Tallawong

Steel, membrane and penetrations, the day before they disappear for good.

  • Steel, pods and membrane in place, the day before concrete
  • About 1 hour on site
  • Report within 24 hours
Request a quoteSend your details and an inspector will ring you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage2 of 7
When to bookSteel, pods and membrane in place, the day before concrete
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, NCC Part 3.2, the engineer's slab design and the soil report

What is included in a Tallawong slab pre-pour inspection

  • Slab class and layout checked against the engineer's design and the soil report
  • Edge beam and internal beam depths and widths
  • Reinforcement size, spacing, laps and trench mesh
  • Bar chairs, cover and support so steel does not sit on the ground
  • Waffle pods, void formers and pod spacing
  • Vapour barrier coverage, laps and tape at penetrations
  • Plumbing and electrical penetrations and sleeves
  • Set-downs for wet areas, garage, porch and alfresco
  • Termite management components installed before the pour
  • Formwork alignment, level and set-out against the plans
  • Stormwater pipe cover and pit positions where visible
  • Site cut, fill and pier holes where visible
  • Hot water service and meter box slab extensions formed
  • Trench cleanliness and debris before the pour
Why it matters here

Slab pre-pour inspections on Tallawong builds

Our August 2026 pre-pour visit in Tallawong produced a list that shows what a slab inspection is for. Internal corners had no re-entrant bars. Edge steel sat too close to the form to get its cover. Mesh touched plumbing penetrations. Termite collars were missing. A beam wider than 300mm lacked its extra bottom bar and loose pods were narrowing another. Every item was fixable before the pour, and none of them could be seen after it.

What we find at this stage in Tallawong

  • Re-entrant bars at each internal corner
  • Cover from steel to every face
  • 25mm clear between mesh and pipes
  • Termite collars on all penetrations
  • Beam widths held by fixed pods and spacers
Vapour barrier laps left untaped, giving ground moisture a path into the slab, found during a slab inspection in Tallawong
Vapour barrier laps left untaped, giving ground moisture a path into the slab
Drainage pipe left open before the pour, inviting debris and a blockage, found during a slab inspection in Tallawong
Drainage pipe left open before the pour, inviting debris and a blockage
A second slab penetration with no termite collar fitted before the pour, found during a slab inspection in Tallawong
A second slab penetration with no termite collar fitted before the pour
Sample findings

Sample defects found during our slab pre-pour inspections in Tallawong

Annotated findings from Slab pre-pour inspections.

Corner bars missing at an internal slab corner, where shrinkage cracks start, found during a slab inspection in Tallawong
Corner bars missing at an internal slab corner, where shrinkage cracks start
Steel sitting too close to the edge form to get its full concrete cover, found during a slab inspection in Tallawong
Steel sitting too close to the edge form to get its full concrete cover
Slab mesh touching a plumbing penetration instead of keeping a 25mm gap, found during a slab inspection in Tallawong
Slab mesh touching a plumbing penetration instead of keeping a 25mm gap
Termite collar missing from a plumbing penetration through the slab, found during a slab inspection in Tallawong
Termite collar missing from a plumbing penetration through the slab

The other stages of a Tallawong build

  1. Bored piers inspection in Tallawong1Bored piersPiers drilled and cages in, concrete not yet ordered
  2. Frame inspection in Tallawong3FrameFrame standing and roof on, before any wrap or lining
  3. Lock-up (pre-plaster) inspection in Tallawong4Lock-up (pre-plaster)Walls, roof and external doors done, plaster not yet hung
  4. Fixing inspection in Tallawong5FixingDoors, stairs and joinery fitted, painter booked next
  5. Waterproofing inspection in Tallawong6WaterproofingMembrane cured, tiler not yet started
  6. Pre-handover (PCI) inspection in Tallawong7Pre-handover (PCI)About two weeks ahead of the handover date

All construction stage inspections in Tallawong →

Guides

Construction stage guides for Tallawong

All guides →

Book a slab pre-pour inspection in Tallawong

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Slab pre-pour inspections in Tallawong: common questions

Why do internal corners need extra bars?

The concrete shrinks as it cures, and the stress gathers at any inside corner. Re-entrant bars across that corner control the crack that would otherwise start there. They are required whether or not the drawing shows them.

What is concrete cover?

The thickness of concrete between the steel and the outside face. Thin cover lets moisture reach the bars, which rust and swell. Bar chairs and edge spacers set it before the pour.

Why must mesh stay clear of pipes?

Steel against a pipe leaves no concrete between them, which weakens that spot and can damage the pipe as the slab moves. A 25mm gap is the minimum.

What is a termite collar for?

It seals the gap around a pipe through the slab so termites cannot travel up beside it into the walls. Without one, the termite system has a hole in it from day one.

How much time is spent at a Tallawong pre-pour?

Around an hour to ninety minutes on a typical Tallawong lot, longer on a large or stepped slab.

Do I get the report before the pour?

That is the point. It is sent the same day so the builder can correct the items before the concrete arrives.

CallGet a Free Quote